Home Case Studies

Links

Address

Business Hours

Fluid Sealing and Engineering Limited are a Rotherham based company that have been in the industry for over 30 years.

We operate primarily in the water and wastewater sectors.

Unit 12 Rother Court

Mangham Road

Rotherham S62 6DR

e: info@fseng.co.uk

t: + 44 (0)1709 522754

Please find below our hours of operation

Monday to Friday:

Saturday & Sunday:

8:30AM to 5PM

CLOSED

©2023 FSE (Fluid Sealing & Engineering Limited) | Built by Platinum Arrow

Home About Us Case Studies Contact

info@fseng.co.uk

+ 44 (0)1709 522754

Home

Due to our large client base, we work in many parts of the UK across a variety of different industry sectors. Below you will find details of some of our most recent and current schemes. Use the buttons to jump straight to a particular project.

Blackburn Carlisle Warkworth Mosswood

Blackburn WwTW Amp6 Upgrade – Laing O’Rourke | United Utilities

Installation of free-issue stainless steel air and process pipework (200-1400nb), supports and launder systems to each of the 6No. Nereda cells and associated tanks; Design, supply & installation of carbon steel coated pipework and supports to the drainage, backwash, and storm return pump stations, Design, supply and installation of WIMES coated carbon steel overflow weir box in the detention tank.

Carlisle WwTW Amp7 Upgrade – Advance Plus | United Utilities

Design, supply & installation of carbon steel coated pipework and supports to the UV & Tertiary Treatment areas (600 – 1200nb), Detention tank pump station (600nb), Storm UV pump station (600-900nb), Screw Pump station (1200nb); Installation of free-issue stainless steel penstocks; Supply and installation of penstock operating gear.

Warkworth WTW Upgrade – J N Bentley | Northumbrian Water

Refurbishment of 4No. clarifiers including the removal of all existing pipework, supports and launders and the design, manufacture and instakllation of new stainless steel inlet pipework (200nb), low level chandelier assemblies, outlet launder channels, flushing system and launder and pipework supports.

Mosswood WTW Upgrade – J N Bentley | Northumbrian Water

Removal of existing filter internal pipework and launders (12No. filters); Design, supply and installation of carbon steel coated pipework and supports plus installation of 12No. free-issue Evoqua UV filters; Design, supply and installation of replacement access steelwork to each of the 12No. filter cells.

Southend Burnley Beckton

Southend Sewer Pump Station – Freeflow | @One Alliance

Installation of 5No. free-issue submersible pumps within 20m deep wetwell; Design, supply and installation of all new carbon steel coated pipework and supports within the wetwell from each of the pumps up to ground level and through to the inlet building.

Burnley Pump Station – Advance Plus | United Utilities

Design, supply and install stainless steel access steelwork/ladder system within 20m deep wet well; Installation of 1200nb carbon steel coated inlet pipework.

Beckton WwTW – Laing O’Rouke | Thames Water

Installation of free-issue grit bridge and rail system and grit classifiers; Design, supply and installation of carbon steel coated and ductile iron pipework and supports for the Supernatent, and Liquor return pump stations; Design, supply and install pvc washwater pipework to inlet screens, stone traps, wash compactors, grit launders, grit classifiers, and hose reels.

Cropston WTW – J N Bentley | Severn Trent

Design, supply and installation of access platform system and security fencing. Installation of free-issue kiosk and penstocks for reservoir draw-off.

Cropston